Our Work

Alamos Gold Shaft Extension
MND Equipment was subcontracted to provide personnel for the removal of 4 head ropes, 3 tail ropes and 8 guide ropes. Additional removal of loading pocket steel infrastructure was also...
Alamos Gold Shaft Extension
MND Equipment was subcontracted to provide personnel for the removal of 4 head ropes, 3 tail ropes and 8 guide ropes. Additional removal of loading pocket steel infrastructure was also...

ODP Hoist Installation
MND Equipment was subcontracted to provide personnel for the installation of 6 staging winches, and 2 hoists along with rope installation.
ODP Hoist Installation
MND Equipment was subcontracted to provide personnel for the installation of 6 staging winches, and 2 hoists along with rope installation.

KL Gold Stage Hoists & Ropes
MND Equipment was subcontracted to provide personnel for the installation of 6 staging winches. This was followed up 2 weeks late with the installation of the 6 winches having the...
KL Gold Stage Hoists & Ropes
MND Equipment was subcontracted to provide personnel for the installation of 6 staging winches. This was followed up 2 weeks late with the installation of the 6 winches having the...

Dome Hoist Removal Project
MND Equipment was subcontracted to provide additional personnel for the removal of two hoist
Dome Hoist Removal Project
MND Equipment was subcontracted to provide additional personnel for the removal of two hoist

Mining Equipment Repair Audits
Mining Equipment Repair Audits afford clients an opportunity to have a detailed breakdown of repairs required along with a compiled parts list and estimated labour to perform any repairs. This...
Mining Equipment Repair Audits
Mining Equipment Repair Audits afford clients an opportunity to have a detailed breakdown of repairs required along with a compiled parts list and estimated labour to perform any repairs. This...

Macassa DD321 Jumbo
MND Equipment executed a complex disassembly and reassembly project for a large underground mining unit at the Macassa Mine site. The unit was prepared on the surface and strategically segmented...
Macassa DD321 Jumbo
MND Equipment executed a complex disassembly and reassembly project for a large underground mining unit at the Macassa Mine site. The unit was prepared on the surface and strategically segmented...